Preparation work for stainless steel duct insulation construction
Jan 07, 2022
1. Make sure that the on-site civil construction has been completed, and there is not much water for construction.
2. Make sure that the construction foundation for the upper pipe, electrical equipment, and fire protection of the stainless steel air pipe is completed to prevent many cross operations from destroying the insulation.
3. After the installation of the air duct system is completed, the quality of the self-inspection is qualified, and the inspection is qualified to the supervisor, and the inspection record of the concealed project is completed.
4. The air leakage rate of the air conditioning system is qualified.
5. The raw materials used for construction have been perfected, the material certification documents and qualification certificates are perfect, the various index values conform to the design regulations, and the zonal supervisor has passed the inspection and approved for use.
6. The ladders, shelves, and lighting fixtures used for construction have been inspected and perfected.